2026 / Parks and sports fields / Medicine Hat, Alberta

Multi-sport complex

Irrigation for a two-phase municipal sports complex with eight ball diamonds and soccer, cricket and rugby pitches, supplied through a booster pump.

8ball diamonds

Year
2026
Location
Medicine Hat, Alberta
Role
Irrigation design, 30% stage

Project data

Fields
Eight ball diamonds plus soccer, cricket and rugby pitches
Point of connection
200 mm, sized to water within the city's recommended watering window
Pump
Booster pump, installed in phase 1
Delivery
Two phases
Status
30% design and budget

Delivered by Jon Barbeau through Greenscape Irrigation Inc.

Next projectResidential building green roof and courtyards →

Send us the drawings.

A base plan and a short description is enough to start. We reply with questions or a proposal.